Menu


Achada

Portugal

Achada Wind Farm, with 6,9 MW, began its operations (PTO) in 2005. It is located in Torres Vedras and is held by Parque Eólico da Serra das Meadas, S.A.


Installed Capacity

6.9MW

No. of turbines

3

Turbine type

Nordex N90 – R80

Hub height

80m

Blade length

45m

Expected P50 energy yield

23GWh

Annual house-hold power equivalent

5,485 homes*

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Business, Energy & Industrial Strategy (BEIS) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^BEIS's long-term average load factor for "all wind" (31.84%) expressed as a fraction of 1 (0.3184). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by BEIS.

^^Annual GB Average Domestic Consumption Values from BEIS (3,509kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.