Menu


Freita I

Portugal

Freita I Wind Farm, with 18,4 MW, began its operations (PTO) in 2006. It is located in Arouca and is held by Iberwind II Produção - Sociedade Unipessoal, Lda.


Installed Capacity

18.4MW

No. of turbines

8

Turbine type

Nordex N90 – R80

Hub height

80m

Blade length

45m

Expected P50 energy yield

40GWh

Annual house-hold power equivalent

14,626 homes*

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Business, Energy & Industrial Strategy (BEIS) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^BEIS's long-term average load factor for "all wind" (31.84%) expressed as a fraction of 1 (0.3184). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by BEIS.

^^Annual GB Average Domestic Consumption Values from BEIS (3,509kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.