Menu


Lomba da Seixa II

Portugal

Lomba da Seixa II Wind Farm, with 12 MW, began its operations (PTO) in 2004. It is located in Montalegre and is held by Parque EĆ³lico da Serra do Larouco, S.A.


Installed Capacity

12MW

No. of turbines

8

Turbine type

General Electric GEWE 1.5 S

Hub height

64.7m

Blade length

35m

Expected P50 energy yield

26GWh

Annual house-hold power equivalent

9,538 homes*

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Business, Energy & Industrial Strategy (BEIS) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^BEIS's long-term average load factor for "all wind" (31.84%) expressed as a fraction of 1 (0.3184). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by BEIS.

^^Annual GB Average Domestic Consumption Values from BEIS (3,509kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.