Menu


Bigorne

Portugal

Bigorne Wind Farm, with 7 MW, began its operations (PTO) in 2002. It is located in Lamego and is held by Parque EĆ³lico da Serra das Meadas S.A.


Installed Capacity

7MW

No. of turbines

4

Turbine type

Vestas V66

Hub height

60m

Blade length

33m

Expected P50 energy yield

16GWh

Annual house-hold power equivalent

5,564 homes*

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Business, Energy & Industrial Strategy (BEIS) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^BEIS's long-term average load factor for "all wind" (31.84%) expressed as a fraction of 1 (0.3184). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by BEIS.

^^Annual GB Average Domestic Consumption Values from BEIS (3,509kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.