Menu


Cabeço Alto

Portugal

Cabeço Alto Wind Farm, with 11,7 MW, began its operations (PTO) in 2000. It is located in Montalegre and is held by Parque Eólico da Serra do Larouco, S.A.


Installed Capacity

11.7MW

No. of turbines

9

Turbine type

Nordex N60

Hub height

60m

Blade length

30m

Expected P50 energy yield

25GWh

Annual house-hold power equivalent

9,300 homes*

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Business, Energy & Industrial Strategy (BEIS) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^BEIS's long-term average load factor for "all wind" (31.84%) expressed as a fraction of 1 (0.3184). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by BEIS.

^^Annual GB Average Domestic Consumption Values from BEIS (3,509kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.