Menu


Igreja Nova

Portugal

Igreja Nova Wind Farm, with 7,2 MW, began its operations (PTO) in stages. The first phase, with 3,3 MW, started in 1999 and the remaining 3,9 MW in 2002. It is located in Mafra and is held by Enerflora - Produção de Energia Eléctrica, Lda.


Installed Capacity

7.2MW

No. of turbines

5

Turbine type

Vestas V66 and Nordex N60

Hub height

60m

Blade length

33m and 30m

Expected P50 energy yield

17GWh

Annual house-hold power equivalent

5,723 homes*

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Business, Energy & Industrial Strategy (BEIS) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^BEIS's long-term average load factor for "all wind" (31.84%) expressed as a fraction of 1 (0.3184). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by BEIS.

^^Annual GB Average Domestic Consumption Values from BEIS (3,509kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.