Menu


Leomil

Portugal

Leomil Wind Farm, with 16,1 MW, began its operations (PTO) in 2008. It is located in Moimenta da Beira and is held by Iberwind II Produção - Sociedade Unipessoal, Lda.


Installed Capacity

16.1MW

No. of turbines

7

Turbine type

Nordex N90 – R80

Hub height

80m

Blade length

45m

Expected P50 energy yield

40GWh

Annual house-hold power equivalent

9,721 homes*

*Based on an average energy yield and assumed annual household usage of 4,115 kWh per year^ = 9,721 homes.

^Typical Domestic Consumption Values from Ofgem. Electricity: Profile Class 2 Medium 4.2MWh

Work with us

People are key to our success and we foster a high-performing, team focused way of thinking.