Menu


Rheidol

United Kingdom

Rheidol Wind Farm is located south of the A44 in Llywernog, Mid Wales, approximately 15 km east of Aberystwyth.


Installed Capacity

2.4MW

No. of turbines

8

Turbine type

0.3MW Bonus Mk III

Expected P50 energy yield

5.8GWh

Annual house-hold power equivalent

1,908 homes*

The wind farm opened in January 1997 and has an installed capacity of 2.4MW. It was acquired from E.ON UK plc in January 2011. Rheidol has a strong operational track record with an average load factor of approximately 29% and its 8 turbines, rated at 300kW, generate enough power to supply 1,908 homes* with electricity.

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Business, Energy & Industrial Strategy (BEIS) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^BEIS's long-term average load factor for "all wind" (31.84%) expressed as a fraction of 1 (0.3184). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by BEIS.

^^Annual GB Average Domestic Consumption Values from BEIS (3,509kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.