Menu


Chiqueiro

Portugal

Chiqueiro Wind Farm, with 4 MW, began its operations (PTO) in 2007. It is located in Pampilhosa da Serra and is held by Iberwind II Produção - Sociedade Unipessoal, Lda.


Installed Capacity

4MW

No. of turbines

2

Turbine type

Vestas V80

Hub height

80m

Blade length

40m

Expected P50 energy yield

9GWh

Annual house-hold power equivalent

3,470 homes*

Any questions relating to this wind farm should be directed to: windfarms@ventientenergy.com

*Based on the Installed Capacity x Department for Energy Security and Net Zero (DESNZ) "all wind" load factor expressed as a fraction of 1^ x number of hours in a year (8,760 hours) / Average Annual Domestic Electricity Consumption (MWh)^^

^DESNZ's long-term average (5-years, 2018-2022) load factor for "all wind" (32.08%) expressed as a fraction of 1 (0.3208). Source for capacity factors is Digest of United Kingdom Energy Statistics (DUKES) published annually by DESNZ.

^^Annual GB Average Domestic Consumption Values from DESNZ (3,239kWh).

Join us

People are the key to achieving our vision – join our high-performance, collaborative and inclusive way of working.